Journal Article

ASGARD: an open-access database of annotated transcriptomes for emerging model arthropod species

Database, Volume 2012, 2012, bas048, https://doi.org/10.1093/database/bas048
Published:
22 November 2012
Article history
Received:
14 August 2012
Revision received:
01 October 2012
Accepted:
16 October 2012
Published:
22 November 2012

Abstract

The increased throughput and decreased cost of next-generation sequencing (NGS) have shifted the bottleneck genomic research from sequencing to annotation, analysis and accessibility. This is particularly challenging for research communities working on organisms that lack the basic infrastructure of a sequenced genome, or an efficient way to utilize whatever sequence data may be available. Here we present a new database, the Assembled Searchable Giant Arthropod Read Database (ASGARD). This database is a repository and search engine for transcriptomic data from arthropods that are of high interest to multiple research communities but currently lack sequenced genomes. We demonstrate the functionality and utility of ASGARD using de novo assembled transcriptomes from the milkweed bug Oncopeltus fasciatus, the cricket Gryllus bimaculatus and the amphipod crustacean Parhyale hawaiensis. We have annotated these transcriptomes to assign putative orthology, coding region determination, protein domain identification and Gene Ontology (GO) term annotation to all possible assembly products. ASGARD allows users to search all assemblies by orthology annotation, GO term annotation or Basic Local Alignment Search Tool. User-friendly features of ASGARD include search term auto-completion suggestions based on database content, the ability to download assembly product sequences in FASTA format, direct links to NCBI data for predicted orthologs and graphical representation of the location of protein domains and matches to similar sequences from the NCBI non-redundant database. ASGARD will be a useful repository for transcriptome data from future NGS studies on these and other emerging model arthropods, regardless of sequencing platform, assembly or annotation status. This database thus provides easy, one-stop access to multi-species annotated transcriptome information. We anticipate that this database will be useful for members of multiple research communities, including developmental biology, physiology, evolutionary biology, ecology, comparative genomics and phylogenomics.

Database URL:asgard.rc.fas.harvard.edu

Introduction

In the early ‘genomic era’ of the late 1990s and early 2000s, the genomes of several long-standing traditional laboratory model organisms were completely sequenced (1–5), which galvanized their respective fields by offering enormous amounts of new data for analysis. Importantly, the beneficial effects of these genome projects were maximized by the simultaneous creation of dedicated web interfaces (e.g. 6–11), or incorporation of the data into existing community databases (e.g. 12), so that users could immediately and easily access and search genome sequences. The advent of next-generation sequencing (NGS) has further advanced biological research not only in traditional model systems, but also in an increasing number of clades that previously lacked genomic data (13–22). High-throughput NGS technology now enables researchers studying non-traditional model organisms to obtain genomic or transcriptomic data relatively efficiently and at modest costs.

Transcriptome and RNA-Seq data are currently the fastest growing category of genomic data across many biological research fields (23, 24). However, unlike the pioneering genome sequence projects, these smaller ‘omics’ datasets are usually minimally annotated to meet the needs of a specific research goal, and are rarely available or searchable in assembled or annotated form. The NCBI’s Sequence Read Archive (SRA) (25) provides a means of archiving data obtained from 454 pyrosequencing, Illumina Genome Analyzer sequencing and other NGS platforms. However, it does not allow for deposition or searching of assembled transcriptomes. Basic Local Alignment Search Tool (BLAST) searches of the SRA data are possible, but only by selecting a single SRA dataset for a given organism at a time. The commonly used NCBI BLAST portal (http://blast.ncbi.nlm.nih.gov/Blast.cgi) does not include SRA data within the nucleotide collection or reference RNA sequences (refseq_rna), although it does allow SRA searches as a specialized BLAST option. The transcriptome shotgun assembly (TSA) database (http://www.ncbi.nlm.nih.gov/genbank/tsa/) allows storage of complete assemblies, but annotation of deposited assemblies is not required. As a result, the potential for leveraging the vast majority of transcriptome data generated are diminished.

One animal clade for which substantial amounts of NGS data are being generated is the Arthropoda (e.g. 21, 22, 26–34). The most speciose animal phylum, arthropods include spiders and scorpions (Chelicerata), centipedes and millipedes (Myriapoda) and insects and crustaceans (Pancrustacea). Arthropods have served as important models for studies of evolutionary biology (35–39), ecology (40–42), physiology (43, 44) and biomechanics (45, 46). As prevalent vectors of human disease and major agricultural pests, arthropods are also of significance to economic development and global health. Finally, the fruit fly Drosophila melanogaster has been a powerful model organism for the study of genetic, evolutionary, developmental and biomedical research for over a century (47, 48) and possesses the most sophisticated genetic analysis toolkit of any animal model (12, 49–51). As a result, functional genetic and genomic studies in other arthropods have flourished by taking advantage of the well characterized Drosophila genome as a point of reference (9, 11, 52–54). However, these studies exhibit a distinct phylogenetic bias: the vast majority of arthropod genomic data available have been generated for the holometabolous insects, which undergo complete metamorphosis. Because the Holometabola are derived in many respects compared with the basally branching Hemimetabola (insects that do not undergo metamorphosis) and other arthropods (55), many recent efforts have used NGS to obtain transcriptome data from other emerging model arthropods (19, 21, 22, 56, V. Zeng, B. Ewen Campben, H.W. Horch et al., submitted for publication). These projects are particularly important for new model organisms for which functional genetic techniques have been developed, as the roles of genes discovered through NGS can be functionally tested in these animals. However, even if these data are deposited in the SRA, as described above, there is typically no public access provided to search the annotated data.

To address this problem, we have created a searchable database of the annotated transcriptomes of three emerging model arthropods, which provide data for a range of phylogenetic diversity within Pancrustacea. All of these organisms have risen to prominence as emerging model organisms due to their ease of inbred laboratory cultures, year-round embryo collection and gene expression analysis via in situ hybridization and antibody staining. The milkweed bug Oncopeltus fasciatus (Figure1, left) belongs to the order Hemiptera, the sister order to all holometabolous insects including Drosophila (55). Determination of gene function is possible in O. fasciatus using maternal or embryonic RNA interference (RNAi) (57–61). The amphipod crustacean Parhyale hawaiensis (Figure 1, middle) is a member of the crustacean class Malacostraca and thus serves as a Pancrustacean outgroup to insects (62). Multiple functional genetic tools have been developed for P. hawaiensis, including gene knockdown by small interfering RNAs (siRNAs) and morpholinos (63–65), stable germ line transgenesis (66), inducible gene overexpression (67), site-directed insertions and enhancer trapping (68). The cricket Gryllus bimaculatus (Figure 1, right) branches basally to both Holometabola and Hemiptera and has multiple advanced functional genetic techniques available, including maternal, zygotic, nymphal and regenerative RNAi (69–72), stable germ line transgenesis (73) and targeted genome editing (74).

Origin and processing of data contained in ASGARD. Flowchart showing adult specimens and tissue types obtained for ASGARD v1.0 organisms O. fasciatus, P. hawaiensis and G. bimaculatus. Total RNA was prepared separately from ovaries and mixed-stage embryos and used for cDNA synthesis. For insect samples, some libraries were normalized in pilot experiments and sequenced using GS-FLX 454 pyrosequencing. The majority of reads used in the de novo assemblies were obtained using GS-FLX Titanium 454 pyrosequencing. SRA accession numbers are shown for each sequenced sample. Reads from each organism were pooled, assembled with Newbler v2.5 and annotated using the data processing pipeline described in the main text. The resulting data are searchable via the ASGARD web interface.
Figure 1

Origin and processing of data contained in ASGARD. Flowchart showing adult specimens and tissue types obtained for ASGARD v1.0 organisms O. fasciatus, P. hawaiensis and G. bimaculatus. Total RNA was prepared separately from ovaries and mixed-stage embryos and used for cDNA synthesis. For insect samples, some libraries were normalized in pilot experiments and sequenced using GS-FLX 454 pyrosequencing. The majority of reads used in the de novo assemblies were obtained using GS-FLX Titanium 454 pyrosequencing. SRA accession numbers are shown for each sequenced sample. Reads from each organism were pooled, assembled with Newbler v2.5 and annotated using the data processing pipeline described in the main text. The resulting data are searchable via the ASGARD web interface.

The database presented here provides a way for researchers in any field to easily search for genes of interest in these animals among previously described maternal and embryonic transcriptome data (21, 22, V. Zeng, B. Ewen Campben, H.W. Horch et al., submitted for publication). The database provides BLAST search capability for any or all transcriptome assemblies, something which is not possible with SRA BLAST searches as the SRA houses only unassembled, un-annotated raw reads. Moreover, all transcriptomes have been annotated for gene orthology, protein coding regions, functional protein domains and Gene Ontology (GO) terms, allowing researchers to search for genes of interest using any of these identifiers.

Database content

The ASGARD integrates annotated assembly information from the maternal and developmental transcriptomes of O. fasciatus, P. hawaiensis and G. bimaculatus. Full details of the creation, assembly and annotation of each transcriptome have been previously described (21, 22, V. Zeng, B. Ewen Campben, H.W. Horch et al., submitted for publication). Briefly, the transcriptome for each organism was created by isolating total RNA from adult ovaries and from embryos of multiple developmental stages (Figure 1, blue boxes). The complementary DNA (cDNA) libraries were sequenced using 454 GS-FLX and Titanium pyrosequencing (Figure 1, green boxes) and assembled using Newbler v2.5. In the cases of the two insects, pilot experiments using GS-FLX and/or library normalization were carried out in the course of transcriptome optimization (Figure 1, blue boxes); the data in ASGARD contains the results of all such pilot experiments incorporated into the relevant assembly (21, V. Zeng, B. Ewen Campben, H.W. Horch et al., submitted for publication). In the case of O. fasciatus, the initial assembly was performed with Newbler v2.3 (21), but prior to integration into ASGARD the raw reads were re-assembled with Newbler v2.5 to make the assembly comparable with those of P. hawaiensis (22) and G. bimaculatus (V. Zeng, B. Ewen Campben, H.W. Horch et al., submitted for publication) (Table 1).

Table 1

Transcriptome assembly statistics for data contained in ASGARD V1.0

SpeciesO. fasciatusP. hawaiensisG. bimaculatus
Class, orderInsecta, HemipteraMalacostraca, AmphipodaInsecta, Orthoptera
No. of raw reads2 087 4103 172 9254 248 346
Mean read length297400349
No. of raw base pairs (bp)619 186 2251 204 620 6141 483 726 666
Assembler(s) usedNewbler v2.3, CAP3Newbler v2.5Newbler v2.5Newbler v2.5
No. of reads input for assembly (percent of raw reads)2 041 966 (97.8)2 041 951 (97.8)3 157 373 (99.5)4 216 721
No. of base pair input for assembly (percent of raw base pairs)566 097 669 (91.4)566 080 984 (91.4)1 179 544 291 (97.9)1 449 059 795 (97.7)
No. of reads used in assembly products (percent of reads input)1 773 450 (86.8)1 794 099 (87.9)2 625 830 (83.2)4 146 625 (98.3)
No. of base pairs assembled (percent of base pair input)508 738 047 (89.9)509 976 789 (90.1)1 027 860 567 (87.1)1 383 106 269 (95.4)
No. of isotigs21 09720 98535 30121 512
No. of isogroups16 61716 84925 73516 456
No. of singletons (percent assembled reads)178 770a (10.1)168 807a (9.5)276 564 (8.8)120 805 (2.9)
No. of CAP3 contigs28 14329 434n/abn/a
Isotig N501735165115102133
No. of isotigs with BLAST hitsc (%)7219d (43.4)7305d (43.4e)10 424 (29.5%)11 943 (55.5)
No. of singletons with BLAST hits (%)2367f (2.8)2350g (2.8)9583 (3.5)10 815 (9.0)
No. of unique BLAST hits10 77510 88619 06719 874
No. of CAP3 contigs with BLAST hits (%)2594 (9.2)2642 (9.0%)n/an/a
Mean no. of contigs per isotig1.91.82.11.7
Mean no. of isotigs per isogroup1.31.21.41.2
Mean coverage per base pair23.228.725.451.3

aRefers to the number of singletons produced by the Newbler v2.3 assembly. These singletons were further assembled with CAP3, resulting in CAP3 contigs and CAP3 singlets (reads still left as singletons); bCAP3 assembly of Newbler singletons was not performed for P. hawaiensis or G. bimaculatus assemblies; cBLASTx performed against the NCBI non-redundant database (nr) with E-value cutoff of e−5, unless otherwise specified; dBLASTx performed against RefSeq Protein database; ePercent isotigs with BLAST hits calculated by dividing by the number of isogroups, because in this case, only one isotig per isogroup was used for BLAST analysis; fTotal number of CAP3 singlets following CAP3 assembly of Newbler v2.3 singletons was 84 388; gTotal number of CAP3 singlets following CAP3 assembly of Newbler v2.5 singletons was 85 053.

The initial descriptions of the O. fasciatus and P. hawaiensis transcriptomes included only BLAST-based and manual gene annotation (21, 22). For all transcriptomes, ‘significant’ BLAST hits were considered as those with a top hit meeting an E-value cutoff of 1e−5 unless otherwise indicated. To improve utility of these data in preparation for ASGARD deposition, the O. fasciatus and P. hawaiensis transcriptomes were further annotated to match the annotation status of the G. bimaculatus transcriptome (V. Zeng, B. Ewen Campben, H.W. Horch et al., submitted for publication) by using: (i) an automated tool called ‘Gene Predictor’ that determines putative orthology based on the best reciprocal top BLAST hit against the D. melanogaster proteome (V. Zeng, B. Ewen Campben, H.W. Horch et al., submitted for publication); (ii) Expressed Sequence Tag (EST) Scan (75) to detect putative coding regions for all predicted transcripts; (iii) InterPro Scan (76) to detect functional protein domains for all predicted protein-coding transcripts and (iv) GO terms (77) obtained by assigning each transcript the GO term of the best reciprocal BLAST hit from the D. melanogaster proteome as in (i), or in the absence of such a hit, the GO term of the top BLAST hit from the NCBI non-redundant database (nr). In total, ASGARD contains data derived from annotating the assembly products of 9 508 681 raw 454 pyrosequenced reads (Figure 1, orange boxes) totaling over 3.25 billion base pairs (Figure 1, Table 1). The outputs of the Newbler assembly contained in ASGARD include ‘isotigs’ (continuous paths through a given set of contigs, named ‘isotigXXXXX’ where XXXXX is a five-digit unique numeric identifier) and ‘singletons’ (high quality single reads lacking significant overlap with any other read, named with a 14-character unique identifier). Newbler also predicts ‘isogroups’, which are groups of isotigs assembled from the same set of ‘contigs’ (groups of reads with significant overlapping regions). However, because of the limitations inherent in making genome structure predictions based on de novo transcriptome data alone [discussed previously (22, V. Zeng, B. Ewen Campben, H.W. Horch et al., submitted for publication)], ASGARD makes no assumptions about putative gene numbers of any component organisms and does not contain explicit annotation of isogroups. The assembly and annotation of all raw data yielded information on 77 798 putative transcripts (isotigs), 59 040 putative genes (isogroups) and 566 176 singletons (unassembled high-quality reads) that obtain 49 827 unique BLAST hits in nr (Figure 1, pink boxes).

We designed ASGARD to serve two principal purposes: (i) to provide a centralized repository for these and future assembled and annotated transcriptomes from emerging model arthropods, as distinct from the source of raw reads already available from the SRA and (ii) to allow users to search for genes of interest in any or all transcriptomes, based on sequence similarity, putative orthology or predicted functional criteria. In this way, ASGARD can help researchers from any field of biology that need sequence data from these arthropods. The following sections briefly describe the main annotation strategies used to provide the data for ASGARD, full methods of which are described elsewhere (21, 22, V. Zeng, B. Ewen Campben, H.W. Horch et al., submitted for publication).

Coding region predictions

Regardless of whether an isotig or singleton (assembly product) obtained a significant BLAST hit, the predicted coding region of each assembly product was processed by EST Scan (75). EST Scan performs coding region prediction based on a Markov model of protein coding sequences to differentiate untranslated regions (UTRs), including 3′- and 5′-UTRs, from coding regions. This probability model is also useful in detecting sequencing errors often associated with the 454 pyrosequencing platform, including the difficulty in resolving homopolymer repeats that may generate frame shifts in the translated protein (78). The transcript position of the highest scoring predicted coding region generated by EST Scan is recorded in the database, which also provides information regarding whether the assembly product likely represents the positive or the negative strand of the actual transcript. This information is visually represented with a schematic diagram in ASGARD. This analysis can thus provide users with putative coding region information for all assembly products of the transcriptomes, even if an isotig or singleton has no predicted orthology to known sequences.

Protein domain predictions

For those assembly products with detected coding regions, their predicted proteins were further annotated using InterPro Scan (76). This tool searches for motif signatures of known functional protein domains within the predicted coding regions of assembly products. To encompass the widest possible range of methods of defining protein motifs, several different protein motif databases are used for this annotation, including ProDom (79), PRINTS (80), SMART (81), TIGRFAMs (82), Pfam (83), Prosite (84), PIRSF (85), SUPERFAMILY (86), CATH (87), PANTHER (88), SignalPHMM (89) and Transmembrane (90). The location of predicted protein domain motifs within the translation is displayed schematically, enabling ASGARD users to better interpret the potential structure and functions of predicted proteins. A link to the relevant protein database website is also generated for each predicted motif, so that users may easily obtain details of specific protein domains.

Orthology (gene identity) predictions

Assembly products of transcriptomes were compared with the NCBI nr database to determine their similarity to known sequences, and the top 50 BLAST hits meeting an E-value cutoff of 1e−5 were recorded in the database. The criterion of reciprocal best BLAST hit against the D. melanogaster proteome is a commonly used method of automated annotation in projects involving insect genomes (e.g. 91, 92). We therefore additionally employed this method of putative orthology assignment as the D. melanogaster proteome is well annotated, and is the best annotated arthropod proteome derived from a complete genome sequence. To do this, we used a previously described custom script called ‘Gene Predictor’ (V. Zeng, B. Ewen Campben, H.W. Horch et al., submitted for publication). Specifically, each D. melanogaster protein was queried against each assembly product of the ASGARD BLAST databases using tBLASTn and conversely, each assembly product was queried against the D. melanogaster proteome BLAST database using BLASTx (93). Because each predicted transcript may comprise multiple assembly products and multiple predicted isoforms may exist for a transcript as discussed below (see ‘Treatment of putative paralogs, isoforms and singletons’ section), only the top 50 results of the D. melanogaster proteome against assembly product query were retained. Similarly, only the top BLAST result of each assembly product against the D. melanogaster proteome was used to infer whether a specific D. melanogaster protein was the best match for a given assembly product. To prevent a given assembly product from being annotated repeatedly as different isoforms of a single D. melanogaster gene, only the longest D. melanogaster protein isoform was considered. To prevent an assembly product from escaping annotation if its top BLAST hit was not the longest isoform of a D. melanogaster gene, all D. melanogaster protein hits were verified based on the gene rather than a particular protein product.

Treatment of putative paralogs, isoforms and singletons

During iteration through the top 50 BLAST results of the D. melanogaster proteome against the assembly products, we also assessed whether those hits that were assigned a putative orthology based on reciprocal BLAST (which we call here ‘verified’ by Gene Predictor) might be paralogs or isoforms. We used criteria for assessing putative paralogs as previously described for the initial assemblies of ASGARD transcriptomes (21, 22, V. Zeng, B. Ewen Campben, H.W. Horch et al., submitted for publication). Specifically, we asked whether the alignments of verified assembly products overlapped with any other verified assembly product that had been assigned the same orthology. If the sequences did not overlap, they were considered to be fragments of a single isoform that were not assembled together due to insufficient overlap. If the assembly product sequences overlapped, then we asked whether they had been predicted as isoforms based on the original assembly. Briefly, if two isotigs shared a contig, they were considered likely to belong to the same isogroup, suggesting that they were isoforms of the same gene. Singletons lack isogroup information and were thus considered as putative isoforms. If overlapping assembly products were not predicted to belong to the same isoform, they were considered as putative paralogs. The same method of paralog inference was used to determine whether specific D. melanogaster genes might have multiple paralogs among the assembly products.

We emphasize that although accurate prediction of isoforms, paralogs and orthologs is not possible in the absence of complete genome sequences and phylogenetic analysis, the assumptions described above will not prevent ASGARD users from obtaining meaningful biological information from the database. Our aim is to facilitate annotation of assembly products, allowing users to retrieve sequence data from these emerging model organisms based on similarity to known genes or predicted function. Even if not all paralogy or isoform assignments of assembly products are accurate, sequence similarity can still be revealed by the reciprocal BLAST searches performed by Gene Prediction.

GO annotations

The GO annotation of each assembly product was obtained using blast2go (94, 95). The top 50 BLASTx hits of each assembly product against nr were exported in M7 format (XML). These XML BLAST data were then processed using the command-line version of blast2go (b2gPipe) with database version 2.3.5.

Database implementation

Unlike a genome database, the database schema of ASGARD is designed around isotigs and singletons (assembly products) rather than genome scaffolds. Figure 2 shows a schematic representation of the database schema with relevant input data and user interface outputs. Because all singletons and isotigs obtained from assembly of raw sequence data have unique identifiers, the ASGARD database uses these identifiers (called ‘read name’ or ‘Sequence ID’) to associate each assembly product with all annotation data. Singular data (including read name, isogroup, assembly product length, nucleotide sequence, predicted coding sequence, translation and coding strand) are stored within one central table (Figure 2, ‘assembled_sequences’). Data where multiple values exist for each assembly product (including protein motifs, BLAST hits and GO annotations) are stored in separate tables (Figure 2, ‘protein_feature’, ‘blast_annotation’ and ‘go_annotation’) with multi-key indexing associated with the read name of the central table. Lastly, data produced by Gene Predictor are stored in a separate table (Figure 2, ‘gene_prediction’). Because under our annotation conditions every assembly product can only be the ortholog of a single gene, the gene prediction table is uniquely keyed to each assembly product identifier. This table is also multi-key indexed for the predicted orthologous gene, which allows rapid query of all assembly products annotated as putative orthologs of that gene.

ASGARD database schema. Schematic of database implementation showing destination tables (gray/white) for each data type created by the data processing pipeline (pink), how users may access those data via the ASGARD web interface (yellow) and sources of linkout data provided by the ASGARD search results displays (blue). See main text for details.
Figure 2

ASGARD database schema. Schematic of database implementation showing destination tables (gray/white) for each data type created by the data processing pipeline (pink), how users may access those data via the ASGARD web interface (yellow) and sources of linkout data provided by the ASGARD search results displays (blue). See main text for details.

To develop ASGARD and implement the ASGARD schema, we used MySQL, custom Perl scripts with the Apache web server hosting tool, and developed custom HTML5 and JavaScript rendering code for the visual output displays.

Site navigation and overview of search capabilities

The home page of ASGARD provides a brief description of the provenance and preparation of the transcript sequences house in the database. To the bottom left is a ‘News’ area where ASGARD development updates are posted. To the bottom right is a ‘Publications’ area that provides updated literature obtained from PubMed mentioning any of the ASGARD transcriptome organisms. A navigation menu at the top of the page allows users to: (i) access pages where they can search ASGARD annotations; (ii) use BLAST to query transcriptome sequences; (iii) obtain contact information for ASGARD developers; (iv) obtain citation information for ASGARD and its component transcriptomes, including links to the PubMed entries and PDFs for download and (v) download the assemblies of all three transcriptomes in FASTA format. The download page also provides links to previously described custom scripts used for assembly (21, 22, V. Zeng, B. Ewen Campben, H.W. Horch et al., submitted for publication), and files listing the BLAST hits of assembly products.

The ‘Search’ link in the top navigation menu takes the user to the main search page of ASGARD, with an introduction to the four search methods provided: (i) Gene Prediction; (ii) Read Name; (iii) GO Annotation and (iv) BLAST Annotation (Figure 3A). The search method introduction text can be shown or hidden using a button on the top left. Users are provided with a drop-down menu containing search options and a second drop-down menu where they can choose the transcriptome they wish to query.

ASGARD Gene Prediction search. The search page gives users access to the Gene Prediction, Read Name, GO Annotation and BLAST Annotation search functions. (A) The input user interface allows users to choose an organism of interest and enter query terms based on D. melanogaster gene names. While entering the search term, users are assisted by an auto-completed list of suggested matching gene names. In this example, a user searching for G. bimaculatus orthologs of Janus kinase (JAK) has begun to enter the name of the D. melanogaster JAK ortholog ‘hopscotch’, which obtained an exact match in the auto-completion list (arrow). (B) The output of the gene prediction search shows predicted ortholog matches, a description of the D. melanogaster gene, schematic representations of and links to matching assembly products.
Figure 3

ASGARD Gene Prediction search. The search page gives users access to the Gene Prediction, Read Name, GO Annotation and BLAST Annotation search functions. (A) The input user interface allows users to choose an organism of interest and enter query terms based on D. melanogaster gene names. While entering the search term, users are assisted by an auto-completed list of suggested matching gene names. In this example, a user searching for G. bimaculatus orthologs of Janus kinase (JAK) has begun to enter the name of the D. melanogaster JAK ortholog ‘hopscotch’, which obtained an exact match in the auto-completion list (arrow). (B) The output of the gene prediction search shows predicted ortholog matches, a description of the D. melanogaster gene, schematic representations of and links to matching assembly products.

The ‘BLAST’ link in the top navigation menu takes users to a page where they can search through transcriptome sequences using the NCBI BLAST algorithm (96). Users can query individual transcriptomes from a given organism, or all transcriptome sequences in a single search.

User interface and query implementation

The following sections describe the input and output user interfaces for the five search capabilities of ASGARD.

Search by Gene Prediction

It can be difficult to distinguish the most likely ortholog to a query sequence among multiple results with low E-values obtained by BLAST searches against nr. For ASGARD users wishing to identify putative O. fasciatus, P. hawaiensis and G. bimaculatus orthologs of genes of interest, the most direct route is therefore to use a Gene Prediction search (Figure 3A). Users can choose an organism of interest from the drop-down menu and enter query terms into the search box. Query terms may be a complete or abbreviated D. melanogaster gene name. A link to FlyBase (12) is provided to help users find D. melanogaster gene names. As the user enters a query term, the auto-complete function suggests results ranked in order of best match, retrieved from the pre-computed reciprocal BLAST data to the D. melanogaster proteome (Figure 3A). Only genes with predicted orthologs in the selected transcriptome appear as results of the auto-complete function, allowing users to quickly detect whether a putative ortholog to their gene of interest is available in ASGARD (Figure 3A, arrow). Users can choose a term from the auto-complete list or click the search button. If any predicted orthologs of the query gene are present in the transcriptomes, ASGARD directs the users to a dynamically generated Common Gateway interface (CGI) page that includes a link to each read annotated as a putative ortholog (Figure 3B). The results page also contains the name of the predicted D. melanogaster ortholog, the FlyBase description of the gene and an explanation of the search results display.

Because the current ASGARD transcriptomes were created with tissue-specific samples and were not all sequenced to saturation (21, 22, V. Zeng, B. Ewen Campben, H.W. Horch et al., submitted for publication), many predicted transcripts are incompletely covered with fragmented (non-overlapping) assembly products. As a result, users may obtain multiple assembly products as matches to a query. In addition, multiple splicing isoforms of many genes may be present in the transcriptomes. The results page therefore includes a graphical interface, designed to help users visualize all of the matching different assembly products identified as putative orthologs of the query gene (Figure 3B), and to understand which portions of their gene of interest have sequence coverage in the transcriptomes. In this schematic, a black bar representing the full-length D. melanogaster protein is used as a parent track and beneath it, the matching regions of each assembly product are displayed on individual tracks as grey bars. Tracks of the same length shown in different shades of grey indicate potential isoforms. The unique identifier (read name) of each assembly product result is listed to the left of the schematic and links to all annotation information about each sequence. On this and all other search result pages, explanatory text and result components can be shown or hidden using buttons at the left.

Search by Read Name

The read name search method provides comprehensive annotation information about each transcript. As read names are the unique identifiers of isotigs and singletons, users are unlikely to know these read names a priori, and will therefore perform this search most easily by clicking on read name links returned as results of gene predictor, BLAST annotation, GO annotation or NCBI BLAST searches in ASGARD. Links to or searches for read names direct users to a dynamically generated CGI page containing all annotation data for the specified read name.

The page displays eight types of information for each assembly product (Figure 4): (i) the read name (‘sequence ID’); (ii) the name of the predicted D. melanogaster ortholog obtained by Gene Predictor if applicable; (iii) the GO annotation prediction if applicable, including a link to the GO accession number that allows users to access all transcripts from the query organism with the same GO annotation; (iv) the nucleotide sequence of the predicted coding strand [negative (NEG) or positive (POS) strand is indicated] based on EST Scan results, including a link to the sequence in FASTA format (predicted non-coding sequences are indicated as such above the nucleotide sequence); (v) the predicted amino acid sequence of the assembly product based on EST Scan results if applicable, including a link to the sequence in FASTA format (for predicted non-coding sequences no translation is shown); (vi) a schematic of the predicted protein coding region (white bar) relative to the entire nucleotide sequence of the assembly product (black bar), the lengths of both sequences are indicated; (vii) a list of predicted functional protein domains based on InterPro Scan analysis if applicable, with a schematic representation of the portion of the transcript sequence containing each domain (yellow bars), for each predicted protein domain, links are provided to the relevant protein database where users can obtain further information about each domain and (viii) the pre-computed results of a BLAST search against the NCBI nr database using the assembly product as a query (E-value cutoff 1e−5). BLAST results are listed in order of increasing E-value, and display the species identity and sequence name of the result, E-value, NCBI accession number and a schematic showing the overlapping region of query (white) and subject (black) sequences. The NCBI accession numbers are links to the corresponding GenBank accession.

ASGARD Read Name search. The input user interface allows users to enter an assembly product (isotig or singleton) unique identifier (read name) obtained with any of the other search methods (Figures 3 and 5–7). In this example, read name isotig04276 was obtained in a Gene Prediction search (Figure 3) as a putative G. bimaculatus JAK ortholog. The output of read name searches provides all annotation data for the selected assembly product.
Figure 4

ASGARD Read Name search. The input user interface allows users to enter an assembly product (isotig or singleton) unique identifier (read name) obtained with any of the other search methods (Figures 3 and 5–7). In this example, read name isotig04276 was obtained in a Gene Prediction search (Figure 3) as a putative G. bimaculatus JAK ortholog. The output of read name searches provides all annotation data for the selected assembly product.

In addition to providing complete information on reads retrieved via other searches, the read name search method will also be useful for researchers to revisit a particular sequence of interest for which they have noted the unique ASGARD read name.

Search by GO Annotation

ASGARD users who would like to identify all transcriptome sequences from a given organism that fall into a given GO category can use the GO Annotation search function. Users select an organism of interest from the drop-down menu and enter query terms into the search box (Figure 5A). All or part of GO term may be used as a query and a link to the GO (77) web page is provided to help users find GO terms if necessary. As the user enters a query term, the auto-complete function suggests GO terms that the user may choose to search, or they can simply enter their desired text and click the search button (Figure 5A).

ASGARD GO Annotation search. (A) The input user interface allows users to choose an organism of interest and enter GO term queries, where they are assisted by an auto-completed list of suggested matching GO terms. In this example, a user searching for G. bimaculatus protein kinases enters the query ‘kinase activity’ into the search box. (B) The output of GO annotation searches based on user-defined queries yields a list of transcriptome sequences that map to the chosen GO term, with links to the read name searches for each sequence. This example shows results obtained by using ‘kinase activity’ as a query. (C) The output of GO annotation searches based on selection of auto-completion menu items yields a list of matching GO terms assigned to transcriptome sequences from the chosen organism, with links to all transcriptome sequences assigned to a given GO term. The example shows results obtained by selecting the GO term ‘protein kinase activity’ from the drop-down auto-completion suggestions shown in (A).
Figure 5

ASGARD GO Annotation search. (A) The input user interface allows users to choose an organism of interest and enter GO term queries, where they are assisted by an auto-completed list of suggested matching GO terms. In this example, a user searching for G. bimaculatus protein kinases enters the query ‘kinase activity’ into the search box. (B) The output of GO annotation searches based on user-defined queries yields a list of transcriptome sequences that map to the chosen GO term, with links to the read name searches for each sequence. This example shows results obtained by using ‘kinase activity’ as a query. (C) The output of GO annotation searches based on selection of auto-completion menu items yields a list of matching GO terms assigned to transcriptome sequences from the chosen organism, with links to all transcriptome sequences assigned to a given GO term. The example shows results obtained by selecting the GO term ‘protein kinase activity’ from the drop-down auto-completion suggestions shown in (A).

In response to user queries, ASGARD utilizes two different search algorithms. The first algorithm is initiated if the user enters a search term and clicks the search button. This algorithm takes the user to a dynamic CGI page with a list of matching GO terms assigned to transcriptome sequences, listed in order of descending relevance (Figure 5B) (relevance is defined as the number of words matching the query possessed by each GO term). GO accession numbers in the results list are links to a page listing transcriptome sequences from their chosen organism that were assigned to the selected GO term.

The second algorithm is used if the user selects a term from the auto-completion list. The auto-completion module uses an exact match algorithm, which means the suggested GO terms must possess each of the search words to be counted as a match. This module shows the first 10 GO terms found under these criteria. Choosing a GO term in this way takes the user to a dynamic CGI page listing transcriptome sequences from their chosen organism that were assigned the selected GO term (Figure 5C). The unique identifiers of these results provide links to the results of the read name search.

Search by BLAST Annotation

Searching for an ASGARD sequence similar to a gene of interest via BLAST is limited by the query sequence, and the Gene Predictor search method is similarly limited by the D. melanogaster proteome sequences. The BLAST annotation search therefore provides users with an alternative method to identify genes that may most closely resemble known sequences from organisms other than D. melanogaster, or that may have been lost in the lineage leading to D. melanogaster. Users select a transcriptome of interest from the drop-down menu and enter a query term, which may be gene name of any organism (Figure 6, top). This prompts a text search through descriptions of all pre-computed BLAST hits against nr for each assembly product in the selected ASGARD transcriptome. The results of the search are displayed on a dynamic CGI page and include the search term and list of BLAST hits in order of increasing E-value (Figure 6, bottom). The results are displayed as described above for the BLAST hit results of the read name search.

ASGARD BLAST Annotation search. Top: the input user interface allows users to select an organism of interest and enter queries based on gene names from any organism. This example shows what a user might enter to search for G. bimaculatus transcripts similar to JAK orthologs from any organism in nr. Bottom: the output of this search lists BLAST hits against nr whose text descriptions contain the search term, with links to the NCBI accession for each hit, schematic representations of matching transcriptome sequences and links to read name data.
Figure 6

ASGARD BLAST Annotation search. Top: the input user interface allows users to select an organism of interest and enter queries based on gene names from any organism. This example shows what a user might enter to search for G. bimaculatus transcripts similar to JAK orthologs from any organism in nr. Bottom: the output of this search lists BLAST hits against nr whose text descriptions contain the search term, with links to the NCBI accession for each hit, schematic representations of matching transcriptome sequences and links to read name data.

BLAST against NCBI nr sequences

Finally, ASGARD users may search all transcriptome sequences based on nucleotide or protein similarity to nr sequences using the embedded NCBI BLAST module. All ASGARD sequences have been formatted as nucleotide BLAST databases. The user interface mimics that of the NCBI BLAST interface, which is likely familiar to prospective ASGARD users. The transcriptome databases can be queried with a nucleotide sequence using BLASTn or tBLASTx or with a protein sequence using tBLASTn (Figure 7A). The output of these searches is formatted identically to BLAST results obtained through NCBI (Figure 7B). Based on the unique identifier of each sequence in ASGARD, BLAST results are parsed to create a link for each hit that directs the user to the read name results. The bit score of each hit links to the alignment of the query and subject sequences for a given BLAST hit.

ASGARD NCBI BLAST search. The BLAST page gives users access to the embedded NCBI BLAST function to query transcriptome sequences with a nucleotide or protein sequence of interest. (A) The input user interface allows users to compare the sequence of any gene of interest to the transcriptome sequences from one or all ASGARD organisms using BLAST. In this example, a user chooses the tBLASTn algorithm to search for G. bimaculatus sequences similar to the D. melanogaster JAK ortholog ‘hopscotch’ by using NCBI accession NP_511119 as a query. (B) The output of this search is transcriptome sequences formatted as for the NCBI BLAST algorithm (97). For each match, the unique identifier links to read name data and the bit score links to the BLAST alignment result. Read names in this output are assigned a prefix identifying the species from which the assembly product derives: GB = Gryllus bimaculatus, OF = Oncopeltus fasciatus, PH = Parhyale hawaiensis. This example shows results of the search for JAK-like G. bimaculatus sequences described in (A).
Figure 7

ASGARD NCBI BLAST search. The BLAST page gives users access to the embedded NCBI BLAST function to query transcriptome sequences with a nucleotide or protein sequence of interest. (A) The input user interface allows users to compare the sequence of any gene of interest to the transcriptome sequences from one or all ASGARD organisms using BLAST. In this example, a user chooses the tBLASTn algorithm to search for G. bimaculatus sequences similar to the D. melanogaster JAK ortholog ‘hopscotch’ by using NCBI accession NP_511119 as a query. (B) The output of this search is transcriptome sequences formatted as for the NCBI BLAST algorithm (97). For each match, the unique identifier links to read name data and the bit score links to the BLAST alignment result. Read names in this output are assigned a prefix identifying the species from which the assembly product derives: GB = Gryllus bimaculatus, OF = Oncopeltus fasciatus, PH = Parhyale hawaiensis. This example shows results of the search for JAK-like G. bimaculatus sequences described in (A).

Conclusions and future perspectives

The ASGARD web interface provides public, searchable access to de novo transcriptomes for three emerging model arthropod species. The original descriptions of these transcriptomes (21, 22, V. Zeng, B. Ewen Campben, H.W. Horch et al., submitted for publication) provided SRA accession numbers (Figure 1) and links to raw data and assembly files but the annotated data for O. fasciatus and P. hawaiensis were initially searchable only by text searches through the FASTA format files. ASGARD provides a solution to this problem, allowing users to obtain comprehensive annotation data for each transcriptome assembly product. In the immediate future, ASGARD will also serve as a repository for the results of RNA-Seq experiments, genome sequencing and other NGS applications on ASGARD organisms. We will augment the existing transcriptomes with such data produced by our group and invite other researchers generating NGS data for O. fasciatus, G. bimaculatus or P. hawaiensis to submit their data to ASGARD for processing via our data analysis pipeline and inclusion in the searchable database. To facilitate this, future versions of ASGARD will contain an upload interface for interested researchers to deposit and annotate their sequence data. As new sequence data are added to ASGARD, the baseline assemblies and annotations will also be updated, providing increasingly comprehensive coverage of the transcriptomes of these arthropods.

If and when future genomic data are generated for these organisms, the ASGARD transcriptomes will provide a useful method of immediately validating genome annotations, as all ASGARD data are currently publicly available. At the moment, to our knowledge, there are no public projects planned for sequencing the genomes of P. hawaiensis or G. bimaculatus. However, sequencing of the O. fasciatus genome (https://www.hgsc.bcm.edu/content/i5k-milkweed-bug) has recently been undertaken by the i5k project (http://arthropodgenomes.org/wiki/i5K), and we plan to ensure that the ASGARD database is fully relational with the O. fasciatus genome data when they become available. At the moment, however, this genome project is in its infancy and no final repository or database structure for the genome data has yet been publicly decided upon.

RNA interference (97) and targeted genome editing techniques (98, 99) have extended the power of functional genetic testing to nearly any arthropod organism in principle (100). The examples of long-standing, highly successful organism-specific databases, including FlyBase (12, 101) and VectorBase (102, 103) illustrate that such databases are instrumental in helping researchers make effective use of functional tools and build sustainable research communities. Albeit at a more modest scale, searchable databases such as ASGARD are required to maximize the potential of NGS data for organisms with limited genomic resources, as they make sequence data publicly available in an easily searchable format. We anticipate that ASGARD will be a useful repository and resource for NGS and genomic data generated for additional non-traditional arthropod models, and welcome deposition of sequence data from researchers working on such organisms.

Funding

The Harvard Stem Cell Institute (Seed Grant number SG-0057-10-00 to C.G.E.); the Ellison Medical Foundation (New Scholar Award number AG-NS-07010-10 to C.G.E.); the National Science Foundation (grant number IOS-0817678 to C.G.E.).

Conflict of interest. None declared.

Acknowledgements

Thanks to James Cuff and the Harvard Faculty of Arts and Sciences Research Computing Group for ASGARD suggestions and discussion, Seth Donoughe for suggestions on figure design and members of the Extavour lab for discussion and ASGARD beta testing.

References

1
Adams
MD
,
Celniker
SE
,
Holt
RA
, et al.
,
The genome sequence of Drosophila melanogaster
, 
Science
,
2000
, vol.
287
(pg.
2185
-
2195
)
2
Venter
JC
,
Adams
MD
,
Myers
EW
, et al.
,
The sequence of the human genome
, 
Science
,
2001
, vol.
291
(pg.
1304
-
1351
)
3
Initiative
AG
.
,
Analysis of the genome sequence of the flowering plant Arabidopsis thaliana
, 
Nature
,
2000
, vol.
408
(pg.
796
-
815
)
4
Goffeau
A
,
Barrell
BG
,
Bussey
H
, et al.
,
Life with 6000 genes
, 
Science
,
1996
, vol.
274
(pg.
546
-
563
)
5
Myers
EW
,
Sutton
GG
,
Delcher
AL
, et al.
,
A whole-genome assembly of Drosophila
, 
Science
,
2000
, vol.
287
(pg.
2196
-
2204
)
6
Mita
K
,
Morimyo
M
,
Okano
K
, et al.
,
The construction of an EST database for Bombyx mori and its application
, 
Proc. Natl Acad. Sci. USA
,
2003
, vol.
100
(pg.
14121
-
14126
)
7
Wang
L
,
Wang
S
,
Li
Y
,
Paradesi
MS
, et al.
,
BeetleBase: the model organism database for Tribolium castaneum
, 
Nucleic Acids Res.
,
2007
, vol.
35
(pg.
D476
-
D479
)
8
Gauthier
JP
,
Legeai
F
,
Zasadzinski
A
, et al.
,
AphidBase: a database for aphid genomic resources
, 
Bioinformatics
,
2007
, vol.
23
(pg.
783
-
784
)
9
Brown
SJ
,
Denell
R
,
Gibbs
R
, et al.
,
The genome of the model beetle and pest Tribolium castaneum
, 
Nature
,
2008
, vol.
452
(pg.
949
-
955
)
10
Consortium
IAG
.
,
Genome sequence of the pea aphid Acyrthosiphon pisum
, 
PLoS Biol.
,
2010
, vol.
8
pg.
e1000313
11
Xia
Q
,
Zhou
Z
,
Lu
C
, et al.
,
A draft sequence for the genome of the domesticated silkworm (Bombyx mori)
, 
Science
,
2004
, vol.
306
(pg.
1937
-
1940
)
12
FlyBase–the Drosophila database
,
The FlyBase Consortium
, 
Nucleic Acids Res.
,
1994
, vol.
22
(pg.
3456
-
3458
)
13
Papanicolaou
A
,
Stierli
R
,
Ffrench-Constant
RH
, et al.
,
Next generation transcriptomes for next generation genomes using est2assembly
, 
BMC Bioinformatics
,
2009
, vol.
10
pg.
447
14
Vera
JC
,
Wheat
CW
,
Fescemyer
HW
, et al.
,
Rapid transcriptome characterization for a nonmodel organism using 454 pyrosequencing
, 
Mol. Ecol.
,
2008
, vol.
17
(pg.
1636
-
1647
)
15
Meyer
E
,
Aglyamova
GV
,
Wang
S
, et al.
,
Sequencing and de novo analysis of a coral larval transcriptome using 454 GSFlx
, 
BMC Genomics
,
2009
, vol.
10
pg.
219
16
Bellin
D
,
Ferrarini
A
,
Chimento
A
, et al.
,
Combining next-generation pyrosequencing with microarray for large scale expression analysis in non-model species
, 
BMC Genomics
,
2009
, vol.
10
pg.
555
17
Birol
I
,
Jackman
SD
,
Nielsen
CB
, et al.
,
De novo transcriptome assembly with ABySS
, 
Bioinformatics
,
2009
, vol.
25
(pg.
2872
-
2877
)
18
Kumar
S
,
Blaxter
ML
.
,
Comparing de novo assemblers for 454 transcriptome data
, 
BMC Genomics
,
2010
, vol.
11
pg.
571
19
Chen
S
,
Yang
P
,
Jiang
F
, et al.
,
De novo analysis of transcriptome dynamics in the migratory locust during the development of phase traits
, 
PLoS ONE
,
2010
, vol.
5
pg.
e15633
20
Surget-Groba
Y
,
Montoya-Burgos
JI
.
,
Optimization of de novo transcriptome assembly from next-generation sequencing data
, 
Genome Res.
,
2010
, vol.
20
(pg.
1432
-
1440
)
21
Ewen-Campen
B
,
Shaner
N
,
Panfilio
KA
, et al.
,
The maternal and embryonic transcriptome of the milkweed bug Oncopeltus fasciatus
, 
BMC Genomics
,
2011
, vol.
12
pg.
61
22
Zeng
V
,
Villanueva
KE
,
Ewen-Campen
B
, et al.
,
De novo assembly and characterization of a maternal and developmental transcriptome for the emerging model crustacean Parhyale hawaiensis
, 
BMC Genomics
,
2011
, vol.
12
pg.
581
23
Wang
Z
,
Gerstein
M
,
Snyder
M
.
,
RNA-Seq: a revolutionary tool for transcriptomics
, 
Nat. Rev. Genet.
,
2009
, vol.
10
(pg.
57
-
63
)
24
Ozsolak
F
,
Milos
PM
.
,
RNA sequencing: advances, challenges and opportunities
, 
Nat. Rev. Genet.
,
2011
, vol.
12
(pg.
87
-
98
)
25
Wheeler
DL
,
Barrett
T
,
Benson
DA
, et al.
,
Database resources of the National Center for Biotechnology Information
, 
Nucleic Acids Res.
,
2008
, vol.
36
(pg.
D13
-
D21
)
26
Zhang
X
,
Zheng
Y
,
Jagadeeswaran
G
, et al.
,
Identification and developmental profiling of conserved and novel microRNAs in Manduca sexta
, 
Insect Biochem. Mol. Biol.
,
2012
, vol.
42
(pg.
381
-
395
)
27
Zhang
D
,
Lax
AR
,
Henrissat
B
, et al.
,
Carbohydrate-active enzymes revealed in Coptotermes formosanus (Isoptera: Rhinotermitidae) transcriptome
, 
Insect Mol. Biol.
,
2012
, vol.
21
(pg.
235
-
245
)
28
Xie
L
,
Zhang
L
,
Zhong
Y
, et al.
,
Profiling the metatranscriptome of the protistan community in Coptotermes formosanus with emphasis on the lignocellulolytic system
, 
Genomics
,
2012
, vol.
99
(pg.
246
-
255
)
29
Liu
F
,
Tang
T
,
Sun
L
, et al.
,
Transcriptomic analysis of the housefly (Musca domestica) larva using massively parallel pyrosequencing
, 
Mol. Biol. Rep.
,
2012
, vol.
39
(pg.
1927
-
1934
)
30
He
W
,
You
M
,
Vasseur
L
, et al.
,
Developmental and insecticide-resistant insights from the de novo assembled transcriptome of the diamondback moth, Plutella xylostella
, 
Genomics
,
2012
, vol.
99
(pg.
169
-
177
)
31
Diego-Garcia
E
,
Peigneur
S
,
Clynen
E
, et al.
,
Molecular diversity of the telson and venom components from Pandinus cavimanus (Scorpionidae Latreille 1802): transcriptome, venomics and function
, 
Proteomics
,
2012
, vol.
12
(pg.
313
-
328
)
32
Blythe
MJ
,
Malla
S
,
Everall
R
, et al.
,
High-throughput sequencing of the Parhyale hawaiensis mRNAs and microRNAs to aid comparative developmental studies
, 
PLoS One
,
2012
, vol.
7
pg.
e33784
33
Bengtsson
JM
,
Trona
F
,
Montagne
N
, et al.
,
Putative chemosensory receptors of the codling moth, Cydia pomonella, identified by antennal transcriptome analysis
, 
PLoS One
,
2012
, vol.
7
pg.
e31620
34
Wang
XW
,
Luan
JB
,
Li
JM
, et al.
,
Transcriptome analysis and comparison reveal divergence between two invasive whitefly cryptic species
, 
BMC Genomics
,
2011
, vol.
12
pg.
458
35
Edgecombe
GD
.
, 
Arthropod Fossils and Phylogeny
,
1998
New York
Columbia University Press
pg.
347
36
Manton
SM
.
, 
The Arthropoda: Habits, Functional Morphology, and Evolution
,
1977
Oxford
Clarendon Press
pg.
527
37
Gupta
AP
.
, 
Arthropod Phylogeny
,
1979
Reinhold
Van Nost
pg.
762
38
Fortey
RA
,
Thomas
RH
.
, 
Arthropod Relationships
,
1998
London
Chapman & Hall
pg.
383
39
Boudreaux
HB
.
, 
Arthropod Phylogeny with Special Reference to Insects
,
1987
Malabar, FL
Robert E. Krieger Publishing Co.
pg.
320
40
Roy
H
,
Clercq
PD
,
Handley
L-JL
, et al.
, 
Invasive Alien Arthropod Predators and Parasitoids: An Ecological Approach
,
2012
New York
Springer
pg.
275
41
Jolivet
P
.
, 
Interrelationship Between Insects and Plants
,
1998
Boca Raton, FL
CRC Press
pg.
336
42
Ozaki
K
,
Yukawa
J
,
Ohgushi
T
, et al.
, 
Galling Arthropods and Their Associates
,
2006
New York
Springer
pg.
304
43
Gupta
AP
.
, 
Immunology of Insects and Other Arthtropods (Comparative Arthrpod Morphology, Physiology, and Development)
,
1991
Boca Raton, FL
CRC Press
pg.
508
44
Wigglesworth
VB
.
, 
Insect Physiology
,
1946
London
Methuen & Co. Ltd.
pg.
134
45
Dudley
R
.
, 
The Biomechanics of Insect Flight: Form, Function, Evolution
,
2002
Princeton, NJ
Princeton University Press
pg.
536
46
Alexander
DE
.
, 
Nature's Flyers: Birds, Insects, and the Biomechanics of Flight
,
2004
Baltimore, MD
The Johns Hopkins University Press
pg.
304
47
Ashburner
M
,
Golic
KG
,
Hawley
RS
.
, 
Drosophila: A Laboratory Handbook
,
2005
NY
Cold Spring Harbor Laboratory Press, Cold Spring Harbor
pg.
1331
48
Morgan
TH
.
,
Sex limited inheritance in Drosophila
, 
Science
,
1910
, vol.
32
(pg.
120
-
122
)
49
Greenspan
RJ
.
, 
Fly Pushing: The Theory and Practice of Drosophila Genetics
,
2004
NY
Cold Spring Harbor Laboratory Press, Cold Spring Harbor
pg.
155
50
del Valle Rodriguez
A
,
Didiano
D
,
Desplan
C
.
,
Power tools for gene expression and clonal analysis in Drosophila
, 
Nat. Chem. Biol.
,
2011
, vol.
9
(pg.
47
-
55
)
51
St Johnston
D
.
,
The art and design of genetic screens: Drosophila melanogaster
, 
Nat. Rev. Genet.
,
2002
, vol.
3
(pg.
176
-
188
)
52
Holt
RA
,
Subramanian
GM
,
Halpern
A
, et al.
,
The genome sequence of the malaria mosquito Anopheles gambiae
, 
Science
,
2002
, vol.
298
(pg.
129
-
149
)
53
Zhan
S
,
Merlin
C
,
Boore
JL
, et al.
,
The monarch butterfly genome yields insights into long-distance migration
, 
Cell
,
2011
, vol.
147
(pg.
1171
-
1185
)
54
Heliconius Genome Consortium
,
Butterfly genome reveals promiscuous exchange of mimicry adaptations among species
, 
Nature
,
2012
, vol.
487
(pg.
94
-
98
)
55
Grimaldi
D
,
Engel
MS
.
, 
Evolution of the Insects
,
2005
Cambridge
Cambridge University Press
pg.
772
56
Khila
A
,
Abouheif
E
,
Rowe
L
.
,
Function, developmental genetics, and fitness consequences of a sexually antagonistic trait
, 
Science
,
2012
, vol.
336
(pg.
585
-
589
)
57
Liu
P
,
Kaufman
TC
.
,
Dissection and fixation of large milkweed bug (Oncopeltus) embryos
, 
Cold Spring Harb. Protoc.
,
2009
, vol.
2009
 
pdb.prot5261
58
Liu
P
,
Kaufman
TC
.
,
Morphology and husbandry of the large milkweed bug, Oncopeltus fasciatus
, 
Cold Spring Harb. Protoc.
,
2009
, vol.
2009
 
pdb.emo127
59
Liu
P
,
Kaufman
TC
.
,
In situ hybridization of large milkweed bug (Oncopeltus) tissues
, 
Cold Spring Harb. Protoc.
,
2009
, vol.
2009
 
pdb.prot5262
60
Hrycaj
S
,
Mihajlovic
M
,
Mahfooz
N
, et al.
,
RNAi analysis of nubbin embryonic functions in a hemimetabolous insect, Oncopeltus fasciatus
, 
Evol. Dev.
,
2008
, vol.
10
(pg.
705
-
716
)
61
Chesebro
J
,
Hrycaj
S
,
Mahfooz
N
, et al.
,
Diverging functions of Scr between embryonic and post-embryonic development in a hemimetabolous insect, Oncopeltus fasciatus
, 
Dev. Biol.
,
2009
, vol.
329
(pg.
142
-
151
)
62
Regier
JC
,
Shultz
JW
,
Zwick
A
, et al.
,
Arthropod relationships revealed by phylogenomic analysis of nuclear protein-coding sequences
, 
Nature
,
2010
, vol.
463
(pg.
1079
-
1083
)
63
Özhan-Kizil
G
,
Havemann
J
,
Gerberding
M
.
,
Germ cells in the crustacean Parhyale hawaiensis depend on Vasa protein for their maintenance but not for their formation
, 
Dev. Biol.
,
2009
, vol.
327
(pg.
230
-
239
)
64
Liubicich
DM
,
Serano
JM
,
Pavlopoulos
A
, et al.
,
Knockdown of Parhyale Ultrabithorax recapitulates evolutionary changes in crustacean appendage morphology
, 
Proc. Natl Acad. Sci. USA
,
2009
, vol.
106
(pg.
13892
-
13896
)
65
Vargas-Vila
MA
,
Hannibal
RL
,
Parchem
RJ
, et al.
,
A prominent requirement for single-minded and the ventral midline in patterning the dorsoventral axis of the crustacean Parhyale hawaiensis
, 
Development
,
2010
, vol.
137
(pg.
3469
-
3476
)
66
Pavlopoulos
A
,
Averof
M
.
,
Establishing genetic transformation for comparative developmental studies in the crustacean Parhyale hawaiensis
, 
Proc. Natl Acad. Sci. USA
,
2005
, vol.
102
(pg.
7888
-
7893
)
67
Pavlopoulos
A
,
Kontarakis
Z
,
Liubicich
DM
, et al.
,
Probing the evolution of appendage specialization by Hox gene misexpression in an emerging model crustacean
, 
Proc. Natl Acad. Sci. USA
,
2009
, vol.
106
(pg.
13897
-
13902
)
68
Kontarakis
Z
,
Pavlopoulos
A
,
Kiupakis
A
, et al.
,
A versatile strategy for gene trapping and trap conversion in emerging model organisms
, 
Development
,
2011
, vol.
138
(pg.
2625
-
2630
)
69
Mito
T
,
Noji
S
.
,
The two-spotted cricket Gryllus bimaculatus: An emerging model for developmental and regeneration studies
, 
Emerging Model Organisms: A Laboratory Manual, Vol. 1
,
2009
Cold Spring Harbor, NY
Cold Spring Harbor Laboratory Press
(pg.
331
-
346
)
70
Miyawaki
K
,
Mito
T
,
Sarashina
I
, et al.
,
Involvement of Wingless/Armadillo signaling in the posterior sequential segmentation in the cricket, Gryllus bimaculatus (Orthoptera), as revealed by RNAi analysis
, 
Mech. Dev.
,
2004
, vol.
121
(pg.
119
-
130
)
71
Nakamura
T
,
Mito
T
,
Bando
T
, et al.
,
Dissecting insect leg regeneration through RNA interference
, 
Cell. Mol. Life Sci.
,
2007
, vol.
65
(pg.
64
-
72
)
72
Takahashi
T
,
Hamada
A
,
Miyawaki
K
, et al.
,
Systemic RNA interference for the study of learning and memory in an insect
, 
J. Neurosci. Methods
,
2009
, vol.
179
(pg.
9
-
15
)
73
Nakamura
T
,
Yoshizaki
M
,
Ogawa
S
, et al.
,
Imaging of transgenic cricket embryos reveals cell movements consistent with a syncytial patterning mechanism
, 
Curr. Biol.
,
2010
, vol.
20
(pg.
1641
-
1647
)
74
Watanabe
T
,
Ochiai
H
,
Sakuma
T
, et al.
,
Non-transgenic genome modifications in a hemimetabolous insect using zinc-finger and TAL effector nucleases
, 
Nat. Commun.
,
2012
, vol.
3
pg.
1017
75
Iseli
C
,
Jongeneel
CV
,
Bucher
P
.
,
ESTScan: a program for detecting, evaluating, and reconstructing potential coding regions in EST sequences
, 
Proc. Int.l Conf. Intell. Syst. Mol. Biol.
,
1999
(pg.
138
-
148
)
76
Zdobnov
EM
,
Apweiler
R
.
,
InterProScan–an integration platform for the signature-recognition methods in InterPro
, 
Bioinformatics
,
2001
, vol.
17
(pg.
847
-
848
)
77
Ashburner
M
,
Ball
CA
,
Blake
JA
, et al.
,
Gene ontology: tool for the unification of biology. The Gene Ontology Consortium
, 
Nat. Genet.
,
2000
, vol.
25
(pg.
25
-
29
)
78
Balzer
S
,
Malde
K
,
Lanzen
A
, et al.
,
Characteristics of 454 pyrosequencing data–enabling realistic simulation with flowsim
, 
Bioinformatics
,
2010
, vol.
26
(pg.
i420
-
i425
)
79
Bru
C
,
Courcelle
E
,
Carrere
S
, et al.
,
The ProDom database of protein domain families: more emphasis on 3D
, 
Nucleic Acids Res.
,
2005
, vol.
33
(pg.
D212
-
D215
)
80
Attwood
TK
,
Coletta
A
,
Muirhead
G
, et al.
,
The PRINTS database: a fine-grained protein sequence annotation and analysis resource–its status in 2012
, 
Database
,
2012
, vol.
2012
 
bas019
81
Letunic
I
,
Goodstadt
L
,
Dickens
NJ
, et al.
,
Recent improvements to the SMART domain-based sequence annotation resource
, 
Nucleic Acids Res.
,
2002
, vol.
30
(pg.
242
-
244
)
82
Haft
DH
,
Selengut
JD
,
White
O
.
,
The TIGRFAMs database of protein families
, 
Nucleic Acids Res.
,
2003
, vol.
31
(pg.
371
-
373
)
83
Bateman
A
,
Coin
L
,
Durbin
R
, et al.
,
The Pfam protein families database
, 
Nucleic Acids Res.
,
2004
, vol.
32
(pg.
D138
-
D141
)
84
Hulo
N
,
Sigrist
CJ
,
LeSaux
V
, et al.
,
Recent improvements to the PROSITE database
, 
Nucleic Acids Res.
,
2004
, vol.
32
(pg.
D134
-
D137
)
85
Wu
CH
,
Nikolskaya
A
,
Huang
H
, et al.
,
PIRSF: family classification system at the Protein Information Resource
, 
Nucleic Acids Res.
,
2004
, vol.
32
(pg.
D112
-
D114
)
86
Gough
J
,
Karplus
K
,
Hughey
R
,
Chothia
C
.
,
Assignment of homology to genome sequences using a library of hidden Markov models that represent all proteins of known structure
, 
J. Mol. Biol.
,
2001
, vol.
313
(pg.
903
-
919
)
87
Pearl
FM
,
Lee
D
,
Bray
JE
, et al.
,
Assigning genomic sequences to CATH
, 
Nucleic Acids Res.
,
2000
, vol.
28
(pg.
277
-
282
)
88
Mi
H
,
Lazareva-Ulitsky
B
,
Loo
R
, et al.
,
The PANTHER database of protein families, subfamilies, functions and pathways
, 
Nucleic Acids Res.
,
2005
, vol.
33
(pg.
D284
-
D288
)
89
Bendtsen
JD
,
Nielsen
H
,
von Heijne
G
, et al.
,
Improved prediction of signal peptides: SignalP 3.0
, 
J. Mol. Biol.
,
2004
, vol.
340
(pg.
783
-
795
)
90
Sonnhammer
EL
,
von Heijne
G
,
Krogh
A
.
,
A hidden Markov model for predicting transmembrane helices in protein sequences
, 
Proc. Int. Conf. Intell. Syst. Mol. Biol.
,
1998
, vol.
6
(pg.
175
-
182
)
91
Chen
F
,
Mackey
AJ
,
Vermunt
JK
, et al.
,
Assessing performance of orthology detection strategies applied to eukaryotic genomes
, 
PLoS One
,
2007
, vol.
2
pg.
e383
92
Yandell
M
,
Mungall
CJ
,
Smith
C
, et al.
,
Large-scale trends in the evolution of gene structures within 11 animal genomes
, 
PLoS Comput. Biol.
,
2006
, vol.
2
pg.
e15
93
Wall
DP
,
Fraser
HB
,
Hirsh
AE
.
,
Detecting putative orthologs
, 
Bioinformatics
,
2003
, vol.
19
(pg.
1710
-
1711
)
94
Conesa
A
,
Götz
S
,
Garcia-Gomez
JM
, et al.
,
Blast2GO: a universal tool for annotation, visualization and analysis in functional genomics research
, 
Bioinformatics
,
2005
, vol.
21
(pg.
3674
-
3676
)
95
Götz
S
,
Garcia-Gomez
JM
,
Terol
J
, et al.
,
High-throughput functional annotation and data mining with the Blast2GO suite
, 
Nucleic Acids Res.
,
2008
, vol.
36
(pg.
3420
-
3435
)
96
Altschul
SF
,
Gish
W
,
Miller
W
, et al.
,
Basic local alignment search tool
, 
J. Mol. Biol.
,
1990
, vol.
215
(pg.
403
-
410
)
97
Moss
EG
.
,
RNA interference: it's a small RNA world
, 
Curr. Biol.
,
2001
, vol.
11
(pg.
R772
-
R775
)
98
Carroll
D
.
,
Genome engineering with zinc-finger nucleases
, 
Genetics
,
2011
, vol.
188
(pg.
773
-
782
)
99
Mussolino
C
,
Cathomen
T
.
,
TALE nucleases: tailored genome engineering made easy
, 
Curr. Opin. Biotechnol.
,
2012
, vol.
23
(pg.
1
-
7
)
100
Denell
R
,
Shippy
T
.
,
Comparative insect developmental genetics: phenotypes without mutants
, 
Bioessays
,
2001
, vol.
23
(pg.
379
-
382
)
101
McQuilton
P
,
St Pierre
SE
,
Thurmond
J
.
,
FlyBase 101–the basics of navigating FlyBase
, 
Nucleic Acids Res.
,
2012
, vol.
40
(pg.
D706
-
D714
)
102
Lawson
D
,
Arensburger
P
,
Atkinson
P
, et al.
,
VectorBase: a home for invertebrate vectors of human pathogens
, 
Nucleic Acids Res.
,
2007
, vol.
35
(pg.
D503
-
D505
)
103
Megy
K
,
Emrich
SJ
,
Lawson
D
, et al.
,
VectorBase: improvements to a bioinformatics resource for invertebrate vector genomics
, 
Nucleic Acids Res.
,
2012
, vol.
40
(pg.
D729
-
D734
)

Author notes

Present address: Victor Zeng, Stylux Incorporated, 25 Stickney Road, Atkinson, NH 03811, USA

This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by-nc/3.0/), which permits non-commercial reuse, distribution, and reproduction in any medium, provided the original work is properly cited. For commercial re-use, please contact journals.permissions@oup.com.
Close
This Feature Is Available To Subscribers Only

Sign In or Create an Account

Close

This PDF is available to Subscribers Only

View Article Abstract & Purchase Options

For full access to this pdf, sign in to an existing account, or purchase an annual subscription.

Close

Gift article access

As a benefit of your subscription, you can share temporary access to restricted articles.

Each link will stop working after 30 days or 10 uses. You may create up to 10 links in a 30 day period.

Please sign in to your personal account to gift article access.

Gift article access

Please create a link below to share with others. This will provide temporary access to this restricted article.

The link will stop working after 30 days or 10 uses. You may create up to 10 links in a 30 day period.

Gift articles remaining: --

Gift article access

The link will stop working after 30 days or 10 uses. You may create up to 10 links in a 30 day period.

Gift articles remaining: --

Gift article access

As a benefit of your subscription, you can share temporary access to restricted articles.

Each link will stop working after 30 days or 10 uses.

You have reached the limit of 10 links within a 30 day period