Journal Article

ForestForward: visualizing and accessing integrated world forest data from the last 50 years

Database, Volume 2025, 2025, baaf018, https://doi.org/10.1093/database/baaf018
Published:
03 March 2025
Article history
Received:
31 July 2024
Revision received:
06 February 2025
Editorial decision:
17 February 2025
Accepted:
21 February 2025
Corrected and typeset:
03 March 2025
Published:
03 March 2025

Abstract

Mitigating the effects of environmental exploitation on forests requires robust data analysis tools to inform sustainable management strategies and enhance ecosystem resilience. Access to extensive, integrated plant biodiversity data, spanning decades, is essential for this purpose. However, such data are often fragmented across diverse datasets with varying standards, posing two key challenges: first, integrating these datasets into a unified, well-structured data warehouse, and second, handling the vast volume of data using big data technologies to analyze and monitor the temporal evolution of ecosystems. To address these challenges, we developed and used an extract, transform, and load (ETL) protocol that curated and integrates 4482 forestry datasets from around the world, dating back to the 18th century, into a 100-GB data warehouse containing over 172 million records sourced from the Global Biodiversity Information Facility repository. We implemented Python scripts and a NoSQL MongoDB database to streamline and automate the ETL process, using the data warehouse to create the ForestForward web platform. ForestForward is a free, user-friendly application developed using the Django framework, which enables users to consult, download, and visualize the curated data. The platform allows users to explore data layers by year and observe the temporal evolution of ecosystems through visual representations.

Database URL: https://forestforward.udl.cat

Introduction

The interconnectedness of human, environmental, and animal health, recognized in the One Health concept [1], underscores the need for sustainable management of ecosystems and biodiversity. Better environmental policies decrease the probability of zoonotic events [2], such as the corona virus disease epidemic of 2019, and help mitigate other consequences of environmental degradation [3]. These events are becoming more frequent because of human activities and climate change that are altering the planet’s ecosystems [4, 5]. We need collaborative, interdisciplinary approaches to achieve optimal health for people, animals, and the environment [6]. These approaches require collecting and integrating high-quality data about the environment, animals, and humans. However, data sources are often too diverse and fragmented, posing considerable challenges to data integration [7]. In addition, satellite technology is creating new data sources that will be crucial for an appropriate management of ecosystems [8, 9]. Still, there are decades and, in some cases, centuries of information regarding the abundance and biodiversity of plants around the world that could help us understand how the green coverage of the planet evolved over large periods.

Many specialized databases contribute to the understanding of global flora. For example, the Global Root Traits (GRooT) [10] provides a complete database specializing in the characteristics of the plant’s roots, while the Global Naturalized Alien Flora (GloNAF) provides data on plant species that were introduced to regions outside their native range [11]. The Global tree portal search offers a searchable database of tree species by scientific name and country [12], while World Flora Online (WFO) provides global taxonomic data, including images of species [13]. As a final example, Global Inventory of Floras and Traits (GIFT) adds a geographical component, allowing users to explore plant species and traits through a map-based interface [14]. However, despite the wealth of data these and other platforms provide, they often remain isolated, and efforts to integrate multisource data are limited.

Two major initiatives have been instrumental in collecting flora data globally, each with its own strengths and limitations. The Global Biodiversity Information Facility (GBIF) is an international platform that provides information from 1760 national, regional, and local institutions including the European Environment Agency and the Atlas of Living Australia (ALA). GBIF collects data about biodiversity from around the world and promotes open data access, making biodiversity data freely available to researchers and providing informatics tools to facilitate biodiversity studies [15]. However, the quality of the various datasets is highly uneven, which can hinder an integrated utilization and limit their usefulness. The other initiative, Global Forest Biodiversity Initiative (GFBI), imposes a stricter and uniform data format and provides controlled access to recent, high-quality forest biodiversity data [16]. While the standardized approach of GFBI enhances the reliability of data for specific analyses, the restricted access to its datasets limits the potential for widespread use, especially by the broader research community.

Combining the strengths of open access data platforms like GBIF with the structured approach of GFBI can significantly improve the capacity for temporal analyses in biodiversity studies. By integrating diverse datasets into a unified framework, researchers can develop more accurate models to predict the effects of climate change and human activities on ecosystems This, in turn, can support more effective conservation strategies and contribute to macroecology and biogeography studies, which require large-scale, spatiotemporal data on species distributions and ecosystem dynamics [17, 18].

Here, we focus on developing and using extract, transform, and load (ETL) tools to integrate thousands of diverse plant abundance datasets from around the world, over large periods into a unified knowledge base, ensuring data consistency. We extract the datasets from GBIF and gather them into a unique database, accessible via the ForestForward web platform. ForestForward follows findable, accessible, interoperable, and reusable (FAIR) and Open Science principles and enables researchers to visualize and download data in uniform format, dating back to the 17th century.

Methodology

Data source and download

The data used in this work were downloaded from GBIF. The first download was done using a link sent by e-mail after a request in the GBIF web page (GBIF.org, 2018). Data were originally downloaded on 3 May 2018. After that, we developed a Python bot that, every 10th day of the month, accesses and processes a comma-separated values (CSV) file from GBIF with all new flora data from the previous month. New datasets are continuously downloaded and integrated. Supplementary Table S1 contains a list of all datasets integrated into ForestForward until September 2024.

Database technology

We chose MongoDB as the database technology for ForestForward. This No-SQL motor manages small and large volumes of data in a flexible and reliable way [19]. Documents are in Javascript Object Notation, but saved in Binary Javascript Object Notation format in MongoDB, which is a format that permits saving the fields inside the document as a key–value pair. We use the Geographic JavaScript Object Notation (GEOJSON) format [20] to save geographic data and perform queries related to location inside a polygon. We defined indexes in the collections to speed up the queries. MongoDB technology facilitates the integration of data from different sources because the data have different features. It also ensures scalability as the database grows larger [21].

Data integration and curation

We designed and implemented a structure that partially replicates the one reported by GFBI (Supplementary Fig. S1) for the ForestForward database. The main difference with respect to GFBI’s database is that we do not store plant diameter and height, because these data were absent from the vast majority of integrated datasets. Figure 1 shows that ForestForward relies on a main knowledge base (Plantae) and an ancillary data collection (Grid). The main collection Plantae saves the individual records from all datasets in a uniform structure. It currently contains over 100 GB of data. The most important fields of this collection are the taxon (species, genus) and geographical coordinates. We defined geographic coordinates (latitude and longitude), species, genus, and year of observation as key fields, in order to speed up searches and guarantee accurate representation on the map. Those fields uniformize the various datasets and facilitate any future integration with GFBI’s knowledge database format, which also contains them. The ancillary collection Grid contains preprocessed information that allows ForestForward to work faster for standard tasks, by lumping data across periods of 1 year and by geographic location. Grid collection has a summary of the amount of documents preprocessed and grouped by geography location, number of species, and temporality of the observation.

The database architecture designed for ForestForward.
Figure 1.

The database architecture designed for ForestForward.

Data curation is done through a semiautomatic process. On the one hand, the curation process looks for duplicate records in new data, before integrating them into the Plantae collection. This search is done by matching source ID, latitude and longitude, species, genus, and year of observation. If duplicates are found, they are not included in the database. On the other hand, incomplete records that lack any of the key fields are stored in a temporary collection, to be revised after automated integration of complete records. During revision, the only records that are integrated into the main Plantae database are those whose only missing information is the species field. We note that these records are also matched to the Plantae collection in search of duplicate records. We discard the new, incomplete, entry if all its fields fully match any pre-existing record. We download new data every month and include them into the Plantae collection, after curation. The new data are also used to recalculate the information and update the Grid collection.

User interface and database integration

ForestForward’s interface was designed to make the database available to the community and enable basic descriptive statistics of the data in a user-friendly manner. The application has a Client–Server architecture developed in the Python-based Django framework [22] that uses the Model–View–Controller (MVC) pattern [23]. The Model layer is related to data, the View layer is related to the application interface, and the Controller layer manages the view requests, querying the model and response to the view. MVC is a design pattern that allows modular independence to the application. With MVC, web views can be modified without affecting the structure and model of the web application.

We achieve the connection between Django and the MongoDB database through the Mongo engine, which maps the data in the Model layer. We use the Folium JavaScript library [24] to represent the world map and overlay the plant data. Statistics and plots are created using the JavaScript library Char.js, which creates maps requiring less memory use, because plots are built during the execution time of the query.

Results

Extract transformation load process

One of the most important processes is obtaining the data from the thousands of GBIF datasets, formatting them uniformly and integrating everything into our database. We automated these tasks by developing and applying a Python script, summarized in Fig. 2.

Pseudo code for the Python script that identifies, downloads, formats, and integrates new GBIF datasets into our database.
Figure 2.

Pseudo code for the Python script that identifies, downloads, formats, and integrates new GBIF datasets into our database.

Database design and implementation

Every document in the Plantae collection has 27 fields. We identify each document with an objectID field called _id. Five database fields maintain traceability of the records to their original datasets: Gbifid, taxonkey, specieskey, datasetkey, and occurrenceid. The first three are of type numeric, and the remaining two are of type string. The four fields, Kingdom, phylum, species, and scientificname, are of type string and contain taxonomic information about the record.

There are nine fields containing geographic information. Countrycode is a string field with the ISO 3611 country code [25], and locality is a string with the location indication. Decimallatitude, decimallongitude, coordinateuncertaintyinmeters, elevation, and depth are numeric fields of coordinate values. Geoloc is a GEOJSON object of type point with the coordinate pair Latitude–Longitude. An array field called grid5 contains the pair Latitude–Longitude of the polygon to which the document belongs to in the Grid collection. There are three fields about precision of geographic information. Coordinateprecision, elevationaccuracy, and depthaccuracy are numeric fields that record precision with respect to the coordinates, elevation, or depth fields (see Supplementary Fig. S1 for details).

Finally, there are four fields containing information about the date in which the record was taken: Eventdate, day, month, and year. Eventdate is a string, while the last three fields are of type numeric. There is one additional field that is a flag to identify the reincorporated records after the quality review where species was replaced by genus.

Documents in the Grid collection have six fields of preprocessing data. The first field is for the identification of type ObjectID called _id. The second field is an array of two elements that contains the vertices of the polygon. The third field contains the preprocessed information about the year of observation. TotalRegistros and totalSpecies are numeric fields with the amount of records preprocessed in this square. Finally, the sixth field, specieList, is an array that has the list of species and the number of records per species in this polygon. This information is summarized in Supplementary Fig. S1.

Data description

From more than 3500 original datasets, after curation and integration, 109 955 246 records were integrated into the ForestForward data warehouse. The curation process discarded 93 407 599 incomplete and 8 821 991 duplicated records, eliminating 49% of the raw data.

A total of 77 687 228 new documents were downloaded between 2018 and 2024. Of these, 62 139 537 were finally incorporated into the ForestForward database [26–32] (GBIF.org 2019, 2020, 2021, 2022, 2023, and 2024) (Fig. 3). The percentage of discarded data in each update of the data warehouse is widely variable. In a few occasions, no new data were discarded, while in others, up to 68% of the new entries did not meet our defined quality standards for integration. Overall, 41.5% of all raw data were not integrated into the ForestForward data warehouse, as we can see in Fig. 3. Currently, the database contains information about 307 898 species in 172 094 783 documents, each with their respective objectID. We note that these number change with each update.

Evolution of records processed and integrated to ForestForward, with the upper curve showing the total number of curated records included in our database from GBIF, and the lower curve showing the total number of records from the GBIF datasets that were excluded from our database due to duplication or low data quality.
Figure 3.

Evolution of records processed and integrated to ForestForward, with the upper curve showing the total number of curated records included in our database from GBIF, and the lower curve showing the total number of records from the GBIF datasets that were excluded from our database due to duplication or low data quality.

Interface and functionality

ForestForward is accessible at https://forestforward.udl.cat. Figure 4a depicts the website’s entry screen. Users can query the data in two ways: by navigating to the search page and filtering results by year, species, and/or country (Fig. 4b). An e-mail address is required to initiate the search. Upon completion, the system generates two files and sends an e-mail containing a link to the download page. The first file, in CSV format, provides the filtered raw data, including species, year, country, latitude, longitude, and dataset key fields. The dataset key links each record to its original dataset. The second file offers a summary of basic descriptive statistics, detailing the number of records found per year and country for the specified search criteria.

ForestForward web user interface (a): we show the users can go to the search view of the data (b), or access the world map directly (c), choosing to view the data for any given year at any geographic location (by clicking on the geographic polygon, a pie chart with information about the species is displayed and a CSV file with the chart data can be downloaded), or display how the number of censed plants and species changed over time (d) and download the data in CSV format.
Figure 4.

ForestForward web user interface (a): we show the users can go to the search view of the data (b), or access the world map directly (c), choosing to view the data for any given year at any geographic location (by clicking on the geographic polygon, a pie chart with information about the species is displayed and a CSV file with the chart data can be downloaded), or display how the number of censed plants and species changed over time (d) and download the data in CSV format.

Users can explore a precompiled dataset on an interactive world map (Fig. 4c, d). The map is overlaid with a 1 × 1-degree longitude and latitude grid, where squares are color-coded to indicate data volume for each region in a given year or period. The color scale ranges from dark green (highest number of records) to transparent (no records). Users can customize the view to display data for any year between 1970 and 2023 or for multiples of 5-year intervals starting at the beginning (e.g. 1970) or middle (e.g. 1975) of any decade in the dataset (Fig. 4d). This choice was made to reduce the number of precompiled intervals that the application needs to load upon use selection, reducing response time. When the view of interest for any year or multiples of 5-year intervals is selected and loaded, users can click any position in the map, and a pie chart with the percentage of plant species in that grid is shown (Fig. 4c). When the view of interest for a multiyear time period is selected and loaded, clicking a position on the map will display a time course of the number of trees and species in the geographical polygon over the years (Fig. 4d). A link in the map allows users to download a CSV file containing all the data used to create the charts.

Access

GBIF data have an open access policy that implements the principles of FAIR [33] and open science, allowing unrestricted access to all researchers. ForestForward follows the same principles. Our platform allows open access to the data, and every grouped data have their own id number. The downloadable CSV format files enable interoperability. Users can download the data by years, by geographic location, and directly from the maps.

Discussion

Access to high-quality data is crucial for researchers, and open access is key to enabling seamless data usage. While many researchers collect their own datasets through fieldwork and experiments, they also rely on data shared by colleagues, governmental agencies, and intergovernmental organizations. However, access to these datasets is often restricted, limiting collaboration and data sharing within the broader scientific community.

Establishing an open access database that integrates data from multiple sources in a cohesive, well-structured manner is essential for advancing scientific research. A platform adhering to the principles of FAIR and open science would foster transparency and collaboration among researchers and institutions. Open access promotes knowledge exchange, facilitating interdisciplinary research and enabling the scientific community to address complex global challenges collectively.

Moreover, an integrated open access database enhances the reproducibility and replicability of scientific results. Researchers can access and verify data from various sources, allowing them to validate or build upon previous studies. This level of transparency strengthens scientific rigor, helping to identify potential errors or biases and contributing to the refinement of research outcomes.

By offering access to diverse datasets, such a database facilitates the exploration of new research avenues and the discovery of novel patterns. It encourages interdisciplinary collaboration and integration across different fields, leading to innovative insights and breakthrough discoveries. Additionally, a platform aligned with FAIR principles ensures equitable access to data, enabling researchers worldwide to contribute to and benefit from shared knowledge, fostering global scientific progress.

Data quality and prefiltering in ForestForward

Data ETL process is a semiautomated approach used to maintain an up-to-date data warehouse. The Extract phase focuses on acquiring high-quality data from multiple sources. Identifying and utilizing as many open access data sources as possible is critical to ensure data integrity and integration. Regular communication with these sources is necessary to facilitate periodic data updates. The Transform phase involves processing large volumes of data to meet the requirements of the data warehouse, which demands significant time and computational power. Efficient data integration requires query optimization and parallel execution, maximizing server core usage. The use of indexing within the Plantae collection has further reduced query processing time by preordering the data. The Load phase involves storing and processing the data to ensure continuous updating, availability, and accessibility. These combined efforts will support the development of a robust geographic and statistical querying tool. This initiative represents a collaborative effort by researchers dedicated to enhancing access to high-quality data for the broader community.

To prioritize data quality, a prefiltering process was implemented before integrating datasets from the GBIF. This prefiltering ensured that only data with well-defined geographic coordinates and species identification were extracted, significantly improving data completeness and accuracy. As a result, the data integrated into ForestForward are three times more complete than those reported by Serra-Diaz [34], where only 20% of the analyzed data were considered complete and high-quality. This rigorous data curation enhances the reliability of ForestForward for spatiotemporal biodiversity analyses.

It is important to note that ForestForward tracks species occurrences over time in different regions. However, changes in the number of occurrence records do not necessarily indicate actual variations in species abundance. These fluctuations may reflect differences in data collection efforts rather than true population changes. For instance, an increase in records may result from more frequent sampling rather than population growth, while a decrease may reflect reduced surveying rather than a population decline. This distinction must be considered when interpreting the data.

Data acquisition and integration across platforms

Data acquisition methods vary among biodiversity platforms. Some, such as the GBIF, ALA, GFBI, GRooT, and WFO, allow direct data contributions from researchers. Others, like ForestForward, GloNAF, and the GIFT, aggregate data from multiple sources, requiring careful handling of multisource datasets to ensure consistency and compatibility.

These platforms manage various types of data, including geospatial data, plant images, and taxonomic information (e.g. species, genus, family, and phylum). Specialized platforms like GRooT, WFO, and GIFT focus on plant physiology and morphology. Table 1 outlines the characteristics of these applications.

Table 1.

Features of available query tools

FeatureForestForwardGBIFGFBIALAGRooTGloNAFWFOGIFT
Data acquisition and integration
Individual contributorsNoYesYesYesYesNoYesNo
Unique data structureYesNoYesNoYesYesYesYes
Integrates datasetsYesYesYesYesYesYesYesYes
Data types
Geographic dataYesYesYesNoNoYesNoYes
Plant imagesNoYesNoYesNoNoYesNo
Plant speciesYesYesYesYesYesYesYesYes
Plant genusYesYesYesYesYesYesYesYes
Plant familiesNoYesYesYesNoYesYesNo
Plant phylumYesYesYesYesNoYesYesNo
PhysiologyNoNoNoNoYesNoNoYes
MorphologyNoNoNoNoYesNoYesYes
Searchable data fields
GISYesYesNoYesNoYesNoYes
SpeciesYesYesNoYesNoYesYesYes
YearYesYesNoYesNoNoNoNo
Data access
FreeYesYesNoYesYesYesYesYes
Download
Data availability for downloadYesYesNoYesYesYesYesYes
Data analysis and representation
Descriptive statisticsYesYesNoYesNoNoNoNo
Graphical representation of statisticsYesNoNoNoNoNoNoNo

Search capabilities also differ across platforms. ForestForward, for instance, supports geospatial queries, allowing users to search by geographical coordinates. Most platforms support taxonomy-based searches, particularly by species, while platforms like GBIF and ForestForward also allow time-based searches, enabling the analysis of species occurrences over specific time periods in given regions.

While most platforms adhere to the principles of open access, GFBI restricts data to consortium members who contribute their own datasets. Similarly, data download options vary, with some platforms requiring a free account for access.

Analytical capabilities

Analytical and visualization tools are critical for biodiversity research. For example, ForestForward offers geospatial representations, basic statistical analyses, and descriptive graphical presentations. Its interactive maps display tree species distributions, aiding the understanding of ecological patterns, biodiversity assessments, and conservation decision-making. Temporal analyses, which examine data changes over time, are particularly important for tracking species distributions, assessing climate change impacts, and studying human interventions on ecosystems [35, 36].

The ability to conduct temporal analyses of species occurrence records is essential for understanding biodiversity changes over time. Detecting patterns in ecosystem changes requires long-term, multisource data collection. ForestForward facilitates this by offering tools that visualize changes over time, a feature lacking in GBIF. These capabilities provide researchers, forest managers, and conservationists with valuable tools for data exploration, analysis, and decision-making.

ForestForward can be useful for researchers studying species distribution over time in specific regions, helping them obtain integrated data to identify patterns. The platform’s development ensures that the scientific community has free access to integrated forestry data.

Future improvements for ForestForward

Future development of ForestForward will focus on three key areas. First, the integration of additional data types, such as climate, biome, and land use data, will enrich biodiversity trend analyses over time. These datasets will enable researchers to examine how environmental changes affect species distributions and ecosystem dynamics. Second, an Application Programming Interface will be developed to facilitate direct integration with other web applications. Finally, in the longer term, machine learning algorithms will be incorporated to support advanced data analysis, offering predictive models for biodiversity trends and helping to identify critical areas for conservation and management.

In conclusion, integrating high-quality, open access data into platforms like ForestForward enhances our understanding of global biodiversity patterns and enables more effective monitoring of changes. By combining multisource datasets and improving analytical tools, researchers can better understand the effects of climate change and human activities on ecosystems, ultimately supporting informed conservation efforts.

Acknowledgements

The authors are members of the consolidated research group 2021SGR1353, accredited by Generalitat de Catalunya.

Author contributions

E.L.T.-G. designed the study, created the database, designed and developed the application, deployed the website, and wrote the manuscript. J.F.M. and F.S. deployed and debugged the website and revised the manuscript. R.A. designed the study, created the database and application, wrote the manuscript, and coordinated the work.

Supplementary data

Supplementary data is available at Database online

Conflict of interest:

None declared.

Funding

None declared.

Data availability

Data is available and downloadable from the webpage and in the Supplementary data.

References

1.

One Health: A New Professional Imperative (PDF)
.
American Veterinary Medical Association
.
2008
.

2.

Stephens
 
PR
,
Gottdenker
 
N
,
Schatz
 
AM
 et al. .
Characteristics of the 100 largest modern zoonotic disease outbreaks
.
Philos Trans R Soc B
 
2021
;
376
:20200535. doi:

3.

Mishra
 
J
,
Mishra
 
P
,
Arora
 
NK
.
Linkages between environmental issues and zoonotic diseases: with reference to COVID-19 pandemic
.
Environ Sustainability
 
2021
;
4
:
455
–
67
. doi:

4.

Alley
 
R
,
Berntsen
 
T
,
Bindoff
 
NL
 et al.  
Intergovernmental Panel On Climate Change Climate Change 2007: The Physical Science Basis Summary for Policymakers Contribution of Working Group I to the Fourth Assessment Report of the Intergovernmental Panel on Climate Change Summary for Policymakers
.
IPCC WGI Fourth Assessment Report
,
2007
.

5.

Bellard
 
C
,
Bertelsmeier
 
C
,
Leadley
 
P
 et al. .
Impacts of climate change on the future of biodiversity
.
Ecol Lett
 
2012
;
15
:
365
–
77
. doi:

6.

Ratnadass
 
A
,
Deguine
 
J-P
.
Crop protection practices and viral zoonotic risks within a One Health framework
.
Sci Total Environ
 
2021
;
774
:145172. doi:

7.

Thuiller
 
W
,
Araújo
 
MB
,
Pearson
 
RG
 et al.  
Uncertainty in predictions of extinction risk
.
Nature
 
2004
;
430
:34. doi:

8.

Wulder
 
MA
,
Roy
 
DP
,
Radeloff
 
VC
 et al.  
Fifty years of Landsat science and impacts
.
Remote Sensing Environ
 
2022
;
280
:113195. doi:

9.

Spoto
 
F
,
Sy
 
O
,
Laberinti
 
P
 et al.  
Overview of sentinel-2
. In: International Geoscience and Remote Sensing Symposium (IGARSS), pp.
1707
–
10
.
Munich
,
2012
. doi:

10.

Guerrero-Ramírez
 
NR
,
Mommer
 
L
,
Freschet
 
GT
 et al.  
Global root traits (GRooT) database
.
Global Ecol Biogeogr
 
2020
;
30
:
25
–
37
. doi:

11.

Hancock
 
SC
,
Essl
 
F
,
Kraak
 
MJ
 et al.  
Introducing the combined atlas framework for large-scale web-based data visualization: the GloNAF atlas of plant invasion
.
Meth Ecol Evolut
 
2022
;
13
:
1073
–
81
. doi:

12.

Beech
 
E
,
Rivers
 
M
,
Oldfield
 
S
 et al. .
GlobalTreeSearch: the first complete global database of tree species and country distributions
.
J Sustainable For
 
2017
;
36
:
454
–
89
. doi:

13.

Borsch
 
T
,
Berendsohn
 
W
,
Dalcin
 
E
 et al.  
World Flora Online: placing taxonomists at the heart of a definitive and comprehensive global resource on the world’s plants
.
TAXON
 
2020
;
69
:
1311
–
41
. doi:

14.

Weigelt
 
P
,
König
 
C
,
Kreft
 
H
.
GIFT – a Global Inventory of Floras and Traits for macroecology and biogeography
.
J Biogeograph
 
2020
;
47
:
16
–
43
. doi:

15.

Telenius
 
A
.
Biodiversity information goes public: GBIF at your service how does GBIF work?
.
Nordic J Bot
 
2011
;
29
:
378
–
81
. doi:

16.

GFBI Bylaw and Data Guideline
(
2023
). https://www.gfbinitiative.org/data (
Accessed November 2023
)

17.

Beck
 
J
,
Ballesteros-Mejia
 
L
,
Buchmann
 
CM
 et al.  
What’s on the horizon for macroecology?
.
Ecography
 
2012
;
35
:
673
–
83
. doi:

18.

Kent
 
M
.
Biogeography and macroecology
.
Prog Phys Geog
 
2005
;
29
:
256
–
64
. doi:

19.

Institute of Electrical and Electronics Engineers
(
n.d.
). In: 2017 International Conference on Networks & Advances in Computational Technologies (NetACT):
20–22 July 2017
,
Trivandrum, Kerala, India
.

20.

Butler
 
H
,
Daly
 
M
,
Doyle
 
A
 et al.  
The Geojson Format
: https://www.rfc-editor.org/rfc/rfc7946 (
13 April 2023, date last accessed
).

21.

Chodorow
 
K
.
MongoDB the Definitive Guide
. p. 409.
Sebastopol, CA, USA
:
O’Reilly Media, Inc
,
2013
.

22.

Holovaty
 
A
,
Kaplan-Moss
 
J
.
The Definitive Guide to Django: Web Development Done Right
.
New York, NY
:
Springer
,
2009
, 499.

23.

Leff
 
A
,
Rayfield
 
JT
.
Web-application development using the Model/View/Controller design pattern
. In: Proceedings - 5th IEEE International Enterprise Distributed Object Computing Conference, pp.
118
–
27
.
Seattle
,
2001 January
,
2001
. doi:

24.

Story
 
R
.
Folium version 0.6.0 (software)
.
2017
. https://github.com/python-visualization/folium  
(13 April 2023, date last accessed)
.

25.

ISO 3166
.
ISO 3166 Country Codes
. 2023 https://www.iso.org/iso-3166-country-codes.html  
(27 June 2023, date last accessed)
.

26.

GBIF.org.
.
GBIF Occurrence Download
.
2018
.

27.

GBIF.org
.
GBIF Occurrence Download
.
2020
.

28.

GBIF.org
.
GBIF Occurrence Download
.
2021
.

29.

GBIF.org
.
GBIF Occurrence Download
.
2022
.

30.

GBIF.org
.
GBIF Occurrence Download
.
2023
.

31.

GBIF.org
.
GBIF Occurrence Download
.
2024
.

32.

GBIF.org
.
GBIF Occurrence Download
.
2024
.

33.

Wilkinson
 
MD
,
Dumontier
 
M
,
Aalbersberg
 
IJ
 et al. .
Comment: The FAIR Guiding Principles for scientific data management and stewardship
.
Scientific Data
 
2016
, 3.

34.

Serra-Diaz
 
JM
,
Enquist
 
BJ
,
Maitner
 
B
 et al. .
Big data of tree species distributions: how big and how good?
.
Forest Ecosyst
 
2017
;
4
:
1
–
2
. doi:

35.

Magurran
 
AE
,
Baillie
 
SR
,
Buckland
 
ST
 et al. .
Long-term datasets in biodiversity research and monitoring: assessing change in ecological communities through time
.
Trends Ecol Evol
 
2010
;
25
:
574
–
82
. doi:

36.

Feeley
 
KJ
,
Silman
 
MR
.
The data void in modeling current and future distributions of tropical species
.
Global Change Biol
 
2011
;
17
:
626
–
30
. doi:

This is an Open Access article distributed under the terms of the Creative Commons Attribution License (https://creativecommons.org/licenses/by/4.0/), which permits unrestricted reuse, distribution, and reproduction in any medium, provided the original work is properly cited.

Supplementary data

Close
This Feature Is Available To Subscribers Only

Sign In or Create an Account

Close

This PDF is available to Subscribers Only

View Article Abstract & Purchase Options

For full access to this pdf, sign in to an existing account, or purchase an annual subscription.

Close

Gift article access

As a benefit of your subscription, you can share temporary access to restricted articles.

Each link will stop working after 30 days or 10 uses. You may create up to 10 links in a 30 day period.

Please sign in to your personal account to gift article access.

Gift article access

Please create a link below to share with others. This will provide temporary access to this restricted article.

The link will stop working after 30 days or 10 uses. You may create up to 10 links in a 30 day period.

Gift articles remaining: --

Gift article access

The link will stop working after 30 days or 10 uses. You may create up to 10 links in a 30 day period.

Gift articles remaining: --

Gift article access

As a benefit of your subscription, you can share temporary access to restricted articles.

Each link will stop working after 30 days or 10 uses.

You have reached the limit of 10 links within a 30 day period